Studio Ash
The process

Behind every finished room.

Stone yards, workshops and half-built sites — a look at the making that sits behind each project, long before the final reveal.

Built-in shelving and marble fire surround going in
Bespoke joinery
Bespoke shelving with concealed air conditioning and marble fire surround
Fold-away desk and hidden television built into existing joinery
Bespoke joinery
A fold-down desk designed to disappear when not in use
Bespoke stone vanity unit being fabricated in the workshop
Workshop
A bespoke vanity unit in fabrication
Fitting a frameless glass shower screen with bronze hardware
Installation
Setting the frameless shower screen
Room mid-renovation with skylight, ready for final fixes
On site
First fix complete, ready for finishes
Mitring a marble corner and plinth
Workshop
Mitred Fior di Pesco marble sections prepared for media wall installation
Arabescato Corchia marble waterfall countertop installed
On site
Arabescato Corchia installed and ready for finishing
Onyx against a proposed paint tone
Material selection
Testing joinery tone against onyx
Steel frame and blockwork mid-construction for a rear extension
On site
Structural steelwork taking shape
Bespoke design oak and glass display cabinet being assembled on site
Installation
Installing bespoke oak joinery
A cedar sauna taking shape
On site
A cedar sauna taking shape
Wall of paint colour swatches being tested on site
Material selection
Testing paint tones in the changing site light
Taj Mahal quartzite slabs at the stone supplier
Stone yard
Slab selection for an en-suite bathroom
Green veined stone floor tiles being laid in a corridor, with a laser level in place
Stone layout
Setting out marble tiles before installation